cwicr-change-order
Process construction change orders using CWICR data. Calculate cost impact, compare to original estimate, and generate change order documentation.
Works with
---
name: cwicr-change-order
description: Process construction change orders using CWICR data. Calculate cost impact, compare to original estimate, and generate change order documentation.
license: MIT
---
# CWICR Change Order Processor
## Business Case
### Problem Statement
Change orders require:
- Quick cost impact analysis
- Comparison to original scope
- Fair pricing for added work
- Documentation for disputes
### Solution
Systematic change order processing using CWICR data to calculate fair costs, document changes, and analyze impact on project budget.
### Business Value
- **Fair pricing** - Based on validated norms
- **Quick turnaround** - Rapid cost analysis
- **Documentation** - Clear change records
- **Budget tracking** - Cumulative impact
## Technical Implementation
```python
import pandas as pd
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from datetime import datetime, date
from enum import Enum
class ChangeType(Enum):
"""Types of changes."""
ADDITION = "addition" # New work added
DELETION = "deletion" # Work removed
MODIFICATION = "modification" # Changed scope
SUBSTITUTION = "substitution" # Material/method change
class ChangeStatus(Enum):
"""Change order status."""
DRAFT = "draft"
SUBMITTED = "submitted"
APPROVED = "approved"
REJECTED = "rejected"
PENDING = "pending"
@dataclass
class ChangeItem:
"""Single change item."""
item_number: int
work_item_code: str
description: str
change_type: ChangeType
original_qty: float
revised_qty: float
unit: str
unit_cost: float
original_cost: float
revised_cost: float
cost_impact: float
@dataclass
class ChangeOrder:
"""Complete change order."""
co_number: str
project_name: str
date_created: date
status: ChangeStatus
description: str
items: List[ChangeItem]
direct_cost_impact: float
overhead_markup: float
profit_markup: float
total_impact: float
schedule_impact_days: int
justification: str
class CWICRChangeOrder:
"""Process change orders using CWICR data."""
def __init__(self,
cwicr_data: pd.DataFrame,
overhead_rate: float = 0.12,
profit_rate: float = 0.08):
self.cost_data = cwicr_data
self.overhead_rate = overhead_rate
self.profit_rate = profit_rate
self._index_data()
self._change_orders: Dict[str, ChangeOrder] = {}
def _index_data(self):
"""Index cost data."""
if 'work_item_code' in self.cost_data.columns:
self._code_index = self.cost_data.set_index('work_item_code')
else:
self._code_index = None
def get_unit_cost(self, code: str) -> Tuple[float, str]:
"""Get unit cost from CWICR."""
if self._code_index is None or code not in self._code_index.index:
return (0, 'unit')
item = self._code_index.loc[code]
labor = float(item.get('labor_cost', 0) or 0)
material = float(item.get('material_cost', 0) or 0)
equipment = float(item.get('equipment_cost', 0) or 0)
unit = str(item.get('unit', 'unit'))
return (labor + material + equipment, unit)
def create_change_order(self,
co_number: str,
project_name: str,
description: str,
justification: str = "") -> str:
"""Create new change order."""
co = ChangeOrder(
co_number=co_number,
project_name=project_name,
date_created=date.today(),
status=ChangeStatus.DRAFT,
description=description,
items=[],
direct_cost_impact=0,
overhead_markup=0,
profit_markup=0,
total_impact=0,
schedule_impact_days=0,
justification=justification
)
self._change_orders[co_number] = co
return co_number
def add_change_item(self,
co_number: str,
work_item_code: str,
change_type: ChangeType,
original_qty: float,
revised_qty: float,
description: str = None) -> ChangeItem:
"""Add item to change order."""
co = self._change_orders.get(co_number)
if co is None:
raise ValueError(f"Change order {co_number} not found")
unit_cost, unit = self.get_unit_cost(work_item_code)
if description is None:
if self._code_index is not None and work_item_code in self._code_index.index:
description = str(self._code_index.loc[work_item_code].get('description', work_item_code))
else:
description = work_item_code
original_cost = original_qty * unit_cost
revised_cost = revised_qty * unit_cost
cost_impact = revised_cost - original_cost
item = ChangeItem(
item_number=len(co.items) + 1,
work_item_code=work_item_code,
description=description,
change_type=change_type,
original_qty=original_qty,
revised_qty=revised_qty,
unit=unit,
unit_cost=unit_cost,
original_cost=round(original_cost, 2),
revised_cost=round(revised_cost, 2),
cost_impact=round(cost_impact, 2)
)
co.items.append(item)
self._recalculate_totals(co_number)
return item
def _recalculate_totals(self, co_number: str):
"""Recalculate change order totals."""
co = self._change_orders.get(co_number)
if co is None:
return
direct_impact = sum(item.cost_impact for item in co.items)
overhead = direct_impact * self.overhead_rate
profit = (direct_impact + overhead) * self.profit_rate
co.direct_cost_impact = round(direct_impact, 2)
co.overhead_markup = round(overhead, 2)
co.profit_markup = round(profit, 2)
co.total_impact = round(direct_impact + overhead + profit, 2)
def set_schedule_impact(self, co_number: str, days: int):
"""Set schedule impact for change order."""
co = self._change_orders.get(co_number)
if co:
co.schedule_impact_days = days
def update_status(self, co_number: str, status: ChangeStatus):
"""Update change order status."""
co = self._change_orders.get(co_number)
if co:
co.status = status
def get_change_order(self, co_number: str) -> Optional[ChangeOrder]:
"""Get change order by number."""
return self._change_orders.get(co_number)
def calculate_quick_impact(self,
changes: List[Dict[str, Any]]) -> Dict[str, Any]:
"""Quick impact calculation without creating CO."""
additions = 0
deletions = 0
modifications = 0
for change in changes:
code = change.get('work_item_code', change.get('code'))
change_type = change.get('change_type', 'modification')
original = change.get('original_qty', 0)
revised = change.get('revised_qty', 0)
unit_cost, _ = self.get_unit_cost(code)
if change_type == 'addition':
additions += revised * unit_cost
elif change_type == 'deletion':
deletions += original * unit_cost
else:
modifications += (revised - original) * unit_cost
net_direct = additions - deletions + modifications
overhead = net_direct * self.overhead_rate
profit = (net_direct + overhead) * self.profit_rate
return {
'additions': round(additions, 2),
'deletions': round(deletions, 2),
'modifications': round(modifications, 2),
'net_direct_impact': round(net_direct, 2),
'overhead': round(overhead, 2),
'profit': round(profit, 2),
'total_impact': round(net_direct + overhead + profit, 2)
}
def compare_to_budget(self,
co_number: str,
original_budget: float,
approved_changes: float = 0) -> Dict[str, Any]:
"""Compare change order to project budget."""
co = self._change_orders.get(co_number)
if co is None:
return {}
current_budget = original_budget + approved_changes
new_budget = current_budget + co.total_impact
return {
'original_budget': original_budget,
'previously_approved_changes': approved_changes,
'current_budget': current_budget,
'this_change_order': co.total_impact,
'new_budget': round(new_budget, 2),
'change_from_original': round(new_budget - original_budget, 2),
'change_percent': round((new_budget - original_budget) / original_budget * 100, 1)
}
def get_project_changes_summary(self,
project_name: str) -> Dict[str, Any]:
"""Get summary of all changes for a project."""
project_cos = [
co for co in self._change_orders.values()
if co.project_name == project_name
]
total_additions = 0
total_deletions = 0
total_impact = 0
total_schedule_impact = 0
for co in project_cos:
for item in co.items:
if item.change_type == ChangeType.ADDITION:
total_additions += item.cost_impact
elif item.change_type == ChangeType.DELETION:
total_deletions += abs(item.cost_impact)
total_impact += co.total_impact
total_schedule_impact += co.schedule_impact_days
return {
'project': project_name,
'total_change_orders': len(project_cos),
'approved': len([co for co in project_cos if co.status == ChangeStatus.APPROVED]),
'pending': len([co for co in project_cos if co.status == ChangeStatus.PENDING]),
'total_additions': round(total_additions, 2),
'total_deletions': round(total_deletions, 2),
'net_cost_impact': round(total_impact, 2),
'total_schedule_days': total_schedule_impact
}
def export_change_order(self,
co_number: str,
output_path: str) -> str:
"""Export change order to Excel."""
co = self._change_orders.get(co_number)
if co is None:
raise ValueError(f"Change order {co_number} not found")
with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
# Header
header_df = pd.DataFrame([{
'Change Order': co.co_number,
'Project': co.project_name,
'Date': co.date_created,
'Status': co.status.value,
'Description': co.description,
'Schedule Impact (days)': co.schedule_impact_days
}])
header_df.to_excel(writer, sheet_name='Summary', index=False)
# Items
items_df = pd.DataFrame([
{
'#': item.item_number,
'Code': item.work_item_code,
'Description': item.description,
'Type': item.change_type.value,
'Original Qty': item.original_qty,
'Revised Qty': item.revised_qty,
'Unit': item.unit,
'Unit Cost': item.unit_cost,
'Original Cost': item.original_cost,
'Revised Cost': item.revised_cost,
'Impact': item.cost_impact
}
for item in co.items
])
items_df.to_excel(writer, sheet_name='Items', index=False)
# Totals
totals_df = pd.DataFrame([{
'Direct Cost Impact': co.direct_cost_impact,
f'Overhead ({self.overhead_rate:.0%})': co.overhead_markup,
f'Profit ({self.profit_rate:.0%})': co.profit_markup,
'Total Impact': co.total_impact
}])
totals_df.to_excel(writer, sheet_name='Totals', index=False)
return output_path
```
## Quick Start
```python
# Load CWICR data
cwicr = pd.read_parquet("TR_workitems_costs_resources_DDC_CWICR.parquet")
# Initialize change order processor
co_processor = CWICRChangeOrder(cwicr, overhead_rate=0.12, profit_rate=0.08)
# Create change order
co_processor.create_change_order(
co_number="CO-001",
project_name="Building A",
description="Additional foundation work due to soil conditions"
)
# Add items
co_processor.add_change_item(
co_number="CO-001",
work_item_code="EXCV-002",
change_type=ChangeType.ADDITION,
original_qty=0,
revised_qty=150
)
# Get change order
co = co_processor.get_change_order("CO-001")
print(f"Direct Impact: ${co.direct_cost_impact:,.2f}")
print(f"Total Impact: ${co.total_impact:,.2f}")
```
## Common Use Cases
### 1. Quick Impact Analysis
```python
changes = [
{'code': 'CONC-001', 'change_type': 'addition', 'original_qty': 0, 'revised_qty': 50},
{'code': 'REBAR-002', 'change_type': 'modification', 'original_qty': 1000, 'revised_qty': 1500}
]
impact = co_processor.calculate_quick_impact(changes)
print(f"Net Impact: ${impact['total_impact']:,.2f}")
```
### 2. Compare to Budget
```python
comparison = co_processor.compare_to_budget(
co_number="CO-001",
original_budget=5000000,
approved_changes=150000
)
print(f"Budget Change: {comparison['change_percent']}%")
```
### 3. Export Documentation
```python
co_processor.export_change_order("CO-001", "change_order_001.xlsx")
```
## Resources
- **GitHub**: [OpenConstructionEstimate-DDC-CWICR](https://github.com/datadrivenconstruction/OpenConstructionEstimate-DDC-CWICR)
- **DDC Book**: Chapter 3.2 - Change Order ManagementMore Writing & Documentation skills
paper-context-resolver
lllllllama/rigorpilot-skills
Rigor Paper Context helper for README-first deep learning repo reproduction. Use only when the README and repository files leave a narrow reproduction-critical gap and the task is to resolve a specific paper detail such as dataset split, preprocessing, evaluation protocol, checkpoint mapping, or runtime assumption from primary paper sources while recording conflicts. Do not use for general paper summary, repo scanning, environment setup, command execution, title-only paper lookup, or replacing README guidance by default.
repo-intake-and-plan
lllllllama/rigorpilot-skills
Rigor Intake helper for README-first deep learning repo reproduction. Use when the task is specifically to scan a repository, read the README and common project files, extract documented commands, classify inference, evaluation, and training candidates, and return the smallest trustworthy reproduction plan to the main orchestrator. Do not use for environment setup, asset download, command execution, final reporting, paper lookup, or end-to-end orchestration.
minimal-run-and-audit
lllllllama/rigorpilot-skills
Rigor Run skill for README-first deep learning repo reproduction. Use when the task is specifically to capture or normalize evidence from the selected smoke test or documented inference or evaluation command and write standardized `repro_outputs/` files, including patch notes when repository files changed. Do not use for training execution, initial repo intake, generic environment setup, paper lookup, target selection, hidden scientific-meaning changes, or end-to-end orchestration by itself.