sprint-plan
Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.
Works with
---
name: sprint-plan
description: Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.
license: MIT
---
## Phase 0: Parse Arguments
Extract the mode argument (`new`, `update`, or `status`) and resolve the review mode (once, store for all gate spawns this run):
1. If `--review [full|lean|solo]` was passed → use that
2. Else read `production/review-mode.txt` → use that value
3. Else → default to `lean`
See `.claude/docs/director-gates.md` for the full check pattern.
**Review mode check** (before gates run):
- Read `production/review-mode.txt` if it exists. Use that mode.
- If the file doesn't exist and this is a `new` sprint: use `AskUserQuestion`:
- Prompt: "No review mode is set. Which review depth would you like for this sprint?"
- Options:
- `[A] full — spawn all director and lead gates`
- `[B] lean — skip non-phase-gate director reviews (recommended for most sprints)`
- `[C] solo — skip all gate spawning`
- After selection: write `production/review-mode.txt` with the chosen mode. Say: "Review mode set to [mode] and saved to production/review-mode.txt."
- If the file doesn't exist and this is NOT a `new` sprint (e.g., updating an existing sprint): default to `lean` silently.
---
## Phase 0.5: Backlog Read
Check for `production/backlog.yaml`.
**If missing**: continue with GDD inference in Phase 1 (degraded mode). Note:
> "No backlog.yaml found — falling back to GDD scan for story candidates. Run `/backlog init` to enable backlog-driven planning."
**If found**: read `production/backlog.yaml`. Identify story candidates in this order:
1. `status: carried-over` — not completed from a previous sprint; offer as first candidates
2. `status: ready` — dependencies met, awaiting sprint planning
3. `status: backlog` — not yet sprinted; surface grouped by `milestone_target`
**Active milestone prioritization**: If `production/milestones/active.txt` exists, read the active milestone name. Within the backlog candidate list, stories where `milestone_target` matches the active milestone appear first, marked `[active milestone]`. Stories targeting other milestones appear after, marked with their `milestone_target` value.
Present to the user before Phase 1 (skip if backlog has no candidates in the above statuses):
> "Backlog candidates for Sprint N: [N carried-over, N ready, N backlog]. Use these as primary story list? [Y/N]"
GDD scan in Phase 1 then runs as a **secondary check** — surfaces new stories not yet in the backlog.
---
## Phase 1: Gather Context
1. **Read the current milestone** from `production/milestones/`.
2. **Read `production/roadmap.yaml`** (if it exists):
- Extract `active_milestone` — confirm it matches the milestone from step 1.
- For the active milestone, read each entry's `slug` and `epic_status`.
- Flag any system with `epic_status: in-progress` — these are incomplete epics
that may need stories this sprint.
- Flag any system with `epic_status: done` that has stories in backlog.yaml still
`in-sprint` or `ready` — this is a status mismatch worth surfacing to the user.
- Note all in-progress epics for Phase 1c (interaction coverage check).
- If roadmap.yaml is missing: continue — degraded mode, no epic status signal.
3. **Read the previous sprint** (if any) from `production/sprints/` to
understand velocity and carryover.
4. **Scan design documents** in `design/gdd/` for features tagged as ready
for implementation.
5. **Check the risk register** at `production/risk-register/`.
6. **Check for pipeline tooling work** — `Glob` for `tools/TOOL_SPEC.md`.
- **Found**: Read it to identify the tool name and purpose. Then ask:
> "I found `tools/TOOL_SPEC.md` — [tool name]: [one-line purpose]. How many
> sprint points do you want to allocate to pipeline tooling this sprint?
> What work needs doing? (Enter 0 or skip to omit tooling from this sprint.)"
Store the allocation and task descriptions for use in Phase 2.
- **Not found**: Continue — tooling section is omitted from the sprint plan.
---
## Phase 1b: Sprint Goal Dependency Audit
**Run this phase before generating any story list.** It prevents the sprint goal that requires
prerequisites that were never scoped, making the goal structurally unachievable from day one.
**Step 1 — State the sprint goal explicitly.**
If the sprint goal comes from the milestone doc, quote it. If not defined yet,
prompt the user with `AskUserQuestion` before continuing.
**Step 2 — Identify what the sprint goal requires to be demonstrable.**
For each sprint goal category, check the corresponding prerequisites:
| Goal type | Prerequisites to verify |
|-----------|------------------------|
| Playable game loop / vertical slice | All entry-point scene/level files in the loop path must exist |
| Feature "works end-to-end" | Scene/level hosting the feature must exist |
| "Players can experience X" | UX flow for X must have a runnable entry point |
| Logic / systems only (no player-visible demo) | No scene prerequisite — skip this audit |
**Step 3 — Check prerequisites exist.**
For any "playable" or "end-to-end" goal, `Glob` for the required scene/level files.
Use the pattern matching the configured engine:
| Engine | Scene file pattern |
|--------|--------------------|
| Godot | `src/**/*.tscn` |
| Unity | `Assets/**/*.unity` |
| Unreal | `Content/**/*.umap` |
| Unknown | Check `CLAUDE.md` → Technology Stack for engine, then use matching pattern |
Compare the found files against what the sprint goal requires.
**Step 4 — Surface missing prerequisites.**
If any prerequisite is missing AND is not already in the current draft story list as a must-have:
> ⚠️ **Goal prerequisite missing: `[path/to/scene-or-level-file]`**
> The sprint goal "[goal]" requires this scene/level to exist. It is not in the codebase
> and is not scoped as a must-have story. Without it, the sprint goal is
> structurally unachievable.
Use `AskUserQuestion`:
- Prompt: "Missing prerequisite: [file]. How do you want to handle this?"
- Options:
- `[A] Add it as a must-have story (Recommended) — scope the scene/level creation into this sprint`
- `[B] Downgrade the sprint goal — remove the runnable-loop requirement`
- `[C] Accept the risk — I know the goal may not be fully demonstrable this sprint`
If [A]: add a scene/level-creation story to the must-have list before Phase 2 begins.
If [B]: rephrase the sprint goal to not promise a runnable demo (e.g., "Implement logic layer for X" instead of "Playable X loop").
If [C]: add a KNOWN RISK block to the sprint plan:
```markdown
> ⚠️ **Known risk:** Sprint goal requires `[file]` which does not exist. Sprint may
> not produce a runnable demo. Playtest sessions dependent on this scene/level are blocked.
```
**Step 5 — Proceed to Phase 2 with prerequisites resolved.**
---
## Phase 2: Generate Output
For `new`:
**Generate a sprint plan** following this format and present it to the user. Do NOT ask to write yet — the producer feasibility gate (Phase 4) runs first and may require revisions before the file is written.
```markdown
# Sprint [N] — [Start Date] to [End Date]
## Sprint Goal
[One sentence describing what this sprint achieves toward the milestone]
## Capacity
- Total days: [X]
- Buffer (20%): [Y days reserved for unplanned work]
- Available: [Z days]
- Tooling allocation: [N points] *(omit this line if no tooling work this sprint)*
## Tasks
### Must Have (Critical Path)
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
### Should Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
### Nice to Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
## Pipeline Tools *(omit this section if tools/TOOL_SPEC.md not found or allocation is 0)*
| ID | Task | Est. Points | Acceptance Criteria |
|----|------|-------------|-------------------|
*Tasks here draw from the tooling allocation, not the game capacity pool.*
## Carryover from Previous Sprint
| Task | Reason | New Estimate |
|------|--------|-------------|
## Risks
| Risk | Probability | Impact | Mitigation |
|------|------------|--------|------------|
## Dependencies on External Factors
- [List any external dependencies]
## Definition of Done for this Sprint
- [ ] All Must Have tasks completed
- [ ] All tasks pass acceptance criteria
- [ ] QA plan exists (`production/qa/qa-plan-sprint-[N].md`)
- [ ] All Logic/Integration stories have passing unit/integration tests
- [ ] Smoke check passed (`/smoke-check sprint`)
- [ ] QA sign-off report: APPROVED or APPROVED WITH CONDITIONS (`/team-qa sprint`)
- [ ] No S1 or S2 bugs in delivered features
- [ ] Design documents updated for any deviations
- [ ] Code reviewed and merged
```
**Immediately after generating the plan output above**, write the draft to disk:
```
production/session-state/drafts/sprint-[N]-draft-YYYYMMDD-HHMMSS.md
```
Create `production/session-state/drafts/` if it does not exist.
This draft survives crashes before the Phase 4 approval gate.
For `update`:
**Update an existing sprint plan**:
1. Read the most recent sprint plan from `production/sprints/`.
2. Present the current story list with their current statuses from `production/sprint-status.yaml`.
3. Ask the user what to change: stories to add, remove, reprioritize, or re-estimate. Use `AskUserQuestion` to gather changes.
4. Apply the changes and re-present the full revised plan for review.
5. Re-run the producer feasibility gate (Phase 4) on the revised plan.
6. Write the updated markdown plan and yaml together (same approval as `new` mode).
Note: `update` mode does not reset story statuses. Stories already marked `in-progress` or `done` keep their status. Only `backlog` and `ready-for-dev` stories can be removed or reprioritized freely.
For `status`:
**Generate a status report**:
```markdown
# Sprint [N] Status -- [Date]
## Progress: [X/Y tasks complete] ([Z%])
### Completed
| Task | Completed By | Notes |
|------|-------------|-------|
### In Progress
| Task | Owner | % Done | Blockers |
|------|-------|--------|----------|
### Not Started
| Task | Owner | At Risk? | Notes |
|------|-------|----------|-------|
### Blocked
| Task | Blocker | Owner of Blocker | ETA |
|------|---------|-----------------|-----|
## Burndown Assessment
[On track / Behind / Ahead]
[If behind: What is being cut or deferred]
## Emerging Risks
- [Any new risks identified this sprint]
```
---
## Phase 2.5: Framework Task Filter
**Run this after the story list is assembled, before writing anything.**
Scan every story in the draft plan for framework-related signals. A story is **framework-related** if any of these match:
| Signal | Example |
|--------|---------|
| Name contains `SKILL.md`, a slash-command (e.g. `/design-review`), `framework`, or `CCGS` | "Update /design-review SKILL.md" |
| Name contains `agent` or `hook` (referring to dev tooling, not game AI) | "Update session-start hook", "Fix producer agent memory" |
| File path is under `.claude/` or in a `foundation` epic | `production/epics/foundation/story-002-*.md` |
| Owner is `"developer"` AND name describes modifying dev tooling | "Add process rules to skill" |
**Note**: game data pipeline tools (`tools/`) are NOT framework tasks — they have their own `Pipeline Tools` section and are not affected by this filter.
If **no** framework stories are detected, skip this phase silently.
If **one or more** framework stories are detected, present them and use `AskUserQuestion`:
- Prompt: "These stories modify the development framework (skills, CCGS tooling), not the game. Include in this sprint?"
- List each detected story with a checkbox option per story
- Also offer:
- `[All] Include all framework stories`
- `[None] Exclude all framework stories`
For any story the user excludes: remove it from the draft plan's task tables and from the sprint-status.yaml draft. Do not silently drop it — note at the bottom of the plan:
```markdown
> **Excluded (framework):** The following stories were removed from this sprint — they modify dev tooling, not game content:
> - [story name]
```
Framework stories are not lost — they persist in their epic files and can be picked up outside the sprint cadence.
---
## Phase 3: Prepare Sprint Status File
After generating a new sprint plan, also prepare the `production/sprint-status.yaml` content.
This is the machine-readable source of truth for story status — read by
`/sprint-status`, `/story-done`, and `/help` without markdown parsing.
**Do not write the yaml yet** — hold it in context. The producer feasibility gate (Phase 4) may revise the story list. Both files will be written together after Phase 4 in a single write approval.
Format:
```yaml
# Auto-generated by /sprint-plan. Updated by /story-done and /dev-story.
# DO NOT edit manually — use /story-done to update story status.
#
# Status value mapping (yaml ↔ story file Status field):
# backlog ↔ Not Started
# ready-for-dev ↔ Ready
# in-progress ↔ In Progress
# review ↔ In Review
# done ↔ Complete
# blocked ↔ Blocked
sprint: [N]
goal: "[sprint goal]"
start: "[YYYY-MM-DD]"
end: "[YYYY-MM-DD]"
generated: "[YYYY-MM-DD]"
updated: "[YYYY-MM-DD]"
stories:
- id: "[epic-story, e.g. 1-1]"
name: "[story name]"
file: "[production/stories/path.md]"
priority: must-have # must-have | should-have | nice-to-have | tooling
status: ready-for-dev # backlog | ready-for-dev | in-progress | review | done | blocked
owner: ""
estimate_days: 0
blocker: ""
completed: ""
```
Initialize each story from the sprint plan's task tables:
- Must Have tasks → `priority: must-have`, `status: ready-for-dev`
- Should Have tasks → `priority: should-have`, `status: backlog`
- Nice to Have tasks → `priority: nice-to-have`, `status: backlog`
- Pipeline Tools tasks → `priority: tooling`, `status: ready-for-dev` (omit `file` field; set `id` to `T[N]-001`, `T[N]-002`, etc.; draw from tooling capacity pool, not game capacity)
For `update`: read the existing `sprint-status.yaml`, carry over statuses for
stories that haven't changed, add new stories, remove dropped ones.
---
## Phase 4: Producer Feasibility Gate
**Review mode check** — apply before spawning PR-SPRINT:
- `solo` → skip. Note: "PR-SPRINT skipped — Solo mode." Proceed to Phase 5 (QA plan gate).
- `lean` → skip (not a PHASE-GATE). Note: "PR-SPRINT skipped — Lean mode." Proceed to Phase 5 (QA plan gate).
- `full` → spawn as normal.
Before finalising the sprint plan, spawn `producer` via Task using gate **PR-SPRINT** (`.claude/docs/director-gates.md`).
Pass: proposed story list (titles, estimates, dependencies), total team capacity in hours/days, any carryover from the previous sprint, milestone constraints and deadline.
Present the producer's assessment.
If UNREALISTIC: revise the story selection (defer stories to Should Have or Nice to Have) and re-present the updated plan before asking for write approval.
If CONCERNS, use `AskUserQuestion`:
- Prompt: "Producer flagged concerns with this sprint plan. How do you want to proceed?"
- Options:
- `[A] Proceed as planned — I accept the risk`
- `[B] Adjust scope — defer some Should Have stories`
- `[C] Extend the sprint timeline`
If [A]: proceed to write approval.
If [B]: revise the story list, re-present the updated plan, then proceed to write approval.
If [C]: adjust sprint dates and capacity, re-present the updated plan, then proceed to write approval.
After handling the producer's verdict, ask: "May I write the sprint plan to `production/sprints/sprint-[N].md` and `production/sprint-status.yaml`?" If yes, write both files (creating directories as needed). Verdict: **COMPLETE** — sprint plan and status file created. If no: Verdict: **BLOCKED** — user declined write.
After writing, add:
> **Scope check:** If this sprint includes stories added beyond the original epic scope, run `/scope-check [epic]` to detect scope creep before implementation begins.
**Backlog sync**: If `production/backlog.yaml` exists, update it silently after write approval:
- For each story in the new sprint: if already in backlog → set `status: in-sprint`; if not in backlog → add new entry with `status: in-sprint`, `sprint: N`, and metadata from the sprint-status.yaml entry.
No separate confirmation needed — covered by the write approval above.
---
## Phase 5: QA Plan Gate
Before closing the sprint plan, check whether a QA plan exists for this sprint.
Use `Glob` to look for `production/qa/qa-plan-sprint-[N].md` or any file in `production/qa/` referencing this sprint number.
**If a QA plan is found**: note it in the sprint plan output — "QA Plan: `[path]`" — and proceed.
**If no QA plan exists**: do not silently proceed. Surface this explicitly:
> "This sprint has no QA plan. A sprint plan without a QA plan means test requirements are undefined — developers won't know what 'done' looks like from a QA perspective, and the sprint cannot pass the Production → Polish gate without one.
>
> Run `/qa-plan sprint` now, before starting any implementation. It takes one session and produces the test case requirements each story needs."
Use `AskUserQuestion`:
- Prompt: "No QA plan found for this sprint. How do you want to proceed?"
- Options:
- `[A] Run /qa-plan sprint now — I'll do that before starting implementation (Recommended)`
- `[B] Skip for now — I understand QA sign-off will be blocked at the Production → Polish gate`
If [A]: close with "Sprint plan written. Run `/qa-plan sprint` next — then begin implementation."
If [B]: add a warning block to the sprint plan document:
```markdown
> ⚠️ **No QA Plan**: This sprint was started without a QA plan. Run `/qa-plan sprint`
> before the last story is implemented. The Production → Polish gate requires a QA
> sign-off report, which requires a QA plan.
```
---
## Phase 6: Next Steps
After the sprint plan is written and QA plan status is resolved:
- `/qa-plan sprint` — **required before implementation begins** — defines test cases per story so developers implement against QA specs, not a blank slate
- `/story-readiness [story-file]` — validate a story is ready before starting it
- `/dev-story [story-file]` — begin implementing the first story
- `/sprint-status` — check progress mid-sprint
- `/scope-check [epic]` — verify no scope creep before implementation begins
**Review mode configuration:** All director gates (producer feasibility, QA review, code review) respect the project review mode. The review mode is set in Phase 0 when the file does not exist (for `new` sprints), or can be overridden per-run with `--review full|lean|solo` as an argument. The file `production/review-mode.txt` contains one of:
- `lean` — skip automated director gates (default if file is absent — fastest for solo dev)
- `full` — run all director gates as spawned sub-agents
- `solo` — skip all gates unconditionally (single-developer, no review)
This file is read by `/sprint-plan`, `/story-readiness`, `/story-done`, and other skills at startup.More Project Management skills
firecrawl-build-onboarding
firecrawl/skills
Get Firecrawl credentials and SDK setup into a project. Use when an application needs `FIRECRAWL_API_KEY`, when an agent should add Firecrawl to `.env`, when the user wants to authenticate Firecrawl for app code, or when choosing the first SDK and docs for a new Firecrawl integration. This skill includes its own browser auth flow, so it does not depend on the website onboarding skill.
email-sequence
coreyhaines31/marketingskills
When the user wants to create or optimize an email sequence, drip campaign, automated email flow, or lifecycle email program. Also use when the user mentions "email sequence," "drip campaign," "nurture sequence," "onboarding emails," "welcome sequence," "re-engagement emails," "email automation," "lifecycle emails," "trigger-based emails," "email funnel," "email workflow," "what emails should I send," "welcome series," or "email cadence." Use this for any multi-email automated flow. For cold outreach emails, see cold-email. For in-app onboarding, see onboarding-cro.
onboard
pbakaus/impeccable
Designs and improves onboarding flows, empty states, and first-run experiences to help users reach value quickly. Use when the user mentions onboarding, first-time users, empty states, activation, getting started, or new user flows.