estimate
>
Works with
---
name: estimate
description: >
license: MIT
---
# /estimate — Effort Estimation
Utility skill. Analyses User Stories, assigns effort estimates using the chosen scale, and produces an estimation table with rationale. Can update the stories artifact in-place or output a standalone estimation report.
## Syntax
```
/estimate [optional: scale] [optional: scope]
```
Examples:
- `/estimate` — estimate all stories using Fibonacci Story Points (default)
- `/estimate t-shirt` — use T-shirt sizes (XS / S / M / L / XL)
- `/estimate days` — estimate in ideal person-days
- `/estimate E-01` — estimate only Epic E-01
- `/estimate US-007` — re-estimate a single story
## Context loading
0. If `00_principles_*.md` exists in the output directory, load it and apply any estimation conventions defined in section 8 (Additional Conventions).
1. Load `03_stories_{slug}.md` — primary input. Required.
2. Load `05_ac_{slug}.md` if it exists — AC scenario count per story is a key complexity signal.
3. Load `02_srs_{slug}.md` — to understand integration points and technical constraints.
4. Load `07a_research_{slug}.md` if it exists — for ADR-driven complexity signals.
## Environment
Read `references/environment.md` from the `ba-toolkit` directory to determine the output directory.
## Calibration interview
> **Follow the [Interview Protocol](../references/interview-protocol.md):** ask one question at a time, present a 2-column `| ID | Variant |` markdown table of up to 4 options plus a free-text "Other" row last (5 rows max), mark exactly one row (recommended), render variants in the user's language (rule 11), and wait for an answer.
>
> **Inline context (protocol rule 9):** if the user wrote text after `/estimate` (e.g., `/estimate t-shirt, post-srs phase, +20% buffer`), parse it and skip the matching questions.
Before estimating, ask the following (skip questions where the answer is already clear from context):
1. **Scale:** Story Points (Fibonacci: 1 / 2 / 3 / 5 / 8 / 13 / 21), T-shirt sizes (XS / S / M / L / XL), or ideal person-days? **Recommended:** Fibonacci Story Points.
2. **Reference stories:** Do you have known reference stories to anchor the scale? (e.g. "US-003 is a 3" or "login is an S") If yes, calibrate against those.
3. **Team assumptions:** Full-stack developer pair? Or separate frontend/backend? *(affects day estimates only)*
4. **Out of scope for this estimate:** Any stories to skip (e.g., already estimated, on ice)?
5. **Estimation phase (Cone of Uncertainty band)** — what's the maturity of the underlying artifacts? **Recommended:** select the band that matches the latest completed pipeline step.
- **Discovery / Brief only** — variance ±400% (4× spread); confidence label "Order of magnitude".
- **Post-SRS** — variance ±100%; confidence label "Rough order of magnitude (ROM)".
- **Post-AC + Use Cases** — variance ±50%; confidence label "Budget estimate".
- **Post-Wireframes + Datadict + APIcontract** — variance ±25%; confidence label "Definitive estimate".
- **Post-Implementation Plan** — variance ±10%; confidence label "Control estimate".
6. **Risk multiplier** — apply a buffer for high-risk stories (those linked to 🔴 Critical or 🟡 High risks in `00_risks_*.md`)? **Recommended:** +20% on Critical-linked stories, +10% on High-linked.
7. **Technical debt allocation** — % of velocity reserved for tech debt, bug-fixes, support? **Recommended:** 20% (industry baseline).
If the user types `/estimate` without additional input and prior context is sufficient, proceed with defaults and state assumptions clearly.
## Estimation model
For each User Story, assess the following complexity factors:
| Factor | Signal | Weight |
|--------|--------|--------|
| **Scope** | Number of distinct user interactions described | Medium |
| **AC count** | More scenarios = higher complexity | Medium |
| **Integration** | External API calls, third-party services, webhooks | High |
| **UI complexity** | Multi-state screens, real-time updates, complex forms | Medium |
| **Data complexity** | New entities, complex relationships, migrations | Medium |
| **Newness** | Team has no prior experience with this area | High |
| **Uncertainty** | Requirements are unclear or flagged with open questions | High |
Apply the reference stories as anchors. If no references are given, calibrate internally: the simplest story in the set = 1 SP or XS.
Do not pad estimates — model what a reasonably skilled team would take, not a worst-case scenario.
## Estimation discipline — what this skill is and is not
This skill produces a **single-estimator analytical pass**. A senior BA running estimation in production would augment this with:
- **Planning poker** — team-based estimation where each developer commits independently and outliers discuss before re-voting. The canonical agile-team estimation technique. `/estimate` cannot do this — it must be run with the dev team after the analytical pass.
- **Wideband Delphi** — multi-round expert estimation with anonymous re-voting. Used when the team is distributed or when politics distort consensus. Same caveat — requires real humans.
**Cone of Uncertainty.** Boehm's classic principle: estimates made early in the lifecycle (post-Brief, post-Discovery) carry up to 4× variance from the eventual reality, narrowing to 1.25× by the time implementation is detailed. This skill **always emits a confidence label** based on the user-selected estimation phase (calibration question 5). A 5 SP estimate at the post-Brief phase is "5 SP ± 400%"; the same estimate at the post-Implementation-Plan phase is "5 SP ± 10%".
**Single-point estimates without a confidence band are dangerous** — they are misread as commitments. Every estimate produced by this skill carries an explicit confidence band tied to the Cone of Uncertainty.
## Output
**Slug:** read the `**Slug:**` line from the managed block of `AGENTS.md` (project root, or `../AGENTS.md` if cwd is `output/`) and use it verbatim. See [`../references/slug-source.md`](../references/slug-source.md).
### If scope ≤ 20 stories — update `03_stories_{slug}.md` in-place
Add a `**Estimate:**` field to each US block and append the Estimation Summary table at the end of the file.
### If scope > 20 stories — create `03_stories_estimates_{slug}.md`
Standalone estimation report with the full table.
---
### Estimation Summary table (always produced in chat as closing output)
```
## Estimation Summary — [PROJECT_NAME]
Scale: [Story Points / T-shirt / Days]
Estimation phase: [Discovery / Brief / SRS / AC / Wireframes / Implementation Plan]
Confidence band: [±400% / ±100% / ±50% / ±25% / ±10%]
Confidence label: [Order of magnitude / ROM / Budget / Definitive / Control]
| US | Title | Epic | Estimate | Confidence | Key drivers |
|----|-------|------|----------|------------|-------------|
| US-001 | [Title] | E-01 | 3 SP ± 25% | Definitive | 2 AC scenarios, simple UI |
| US-002 | [Title] | E-01 | 8 SP ± 25% | Definitive | external payment API, 4 AC scenarios |
| US-003 | [Title] | E-02 | 13 SP ± 50% | Budget | new domain area, complex state machine, RISK-02 +20% |
...
| Metric | Value |
|--------|-------|
| Total stories estimated | [N] |
| Total Story Points (point estimate) | [N] SP |
| Total with confidence band | [N – N] SP ([low] – [high]) |
| Largest story | US-[NNN] ([N] SP) — [reason] |
| Stories ≥ 13 SP (consider splitting) | [N]: US-[NNN], … |
| Average per story | [N] SP |
| Risk-adjusted total (high-risk +20%) | [N] SP |
| Tech debt reservation ([N]%) | [N] SP |
| **Net feature capacity** | [N] SP |
```
> ⚠️ **Single-estimator caveat.** This is an analytical estimation pass by a single estimator. For a real team commitment, run **planning poker** with the dev team using these numbers as the starting anchor and re-vote on any item where the team's estimate differs by more than one Fibonacci step.
### Splitting recommendations
For any story estimated at 13 SP or higher (or XL), suggest a concrete split:
```
⚠️ US-[NNN] ([N] SP) is large. Consider splitting:
→ US-[NNN]a: [sub-story suggestion]
→ US-[NNN]b: [sub-story suggestion]
Run /split US-[NNN] to perform the split.
```
## Closing message
After saving, present the following summary (see `references/closing-message.md` for format):
- Saved file path (if stories artifact updated) or new estimate file created.
- Scale used and total estimate.
- Number of stories estimated.
- Stories flagged for splitting (if any).
- Assumptions made (if defaults were applied without a calibration interview).
Available commands: `/estimate [US-NNN]` (re-estimate a story) · `/split [US-NNN]` (split a large story) · `/analyze` · `/done`
## Style
Be explicit about the rationale for each estimate. Use concise bullet drivers, not paragraphs. Generate output in the language of the artifact — see `references/language-rule.md` for what to translate and what stays in English.More Project Management skills
firecrawl-build-onboarding
firecrawl/skills
Get Firecrawl credentials and SDK setup into a project. Use when an application needs `FIRECRAWL_API_KEY`, when an agent should add Firecrawl to `.env`, when the user wants to authenticate Firecrawl for app code, or when choosing the first SDK and docs for a new Firecrawl integration. This skill includes its own browser auth flow, so it does not depend on the website onboarding skill.
email-sequence
coreyhaines31/marketingskills
When the user wants to create or optimize an email sequence, drip campaign, automated email flow, or lifecycle email program. Also use when the user mentions "email sequence," "drip campaign," "nurture sequence," "onboarding emails," "welcome sequence," "re-engagement emails," "email automation," "lifecycle emails," "trigger-based emails," "email funnel," "email workflow," "what emails should I send," "welcome series," or "email cadence." Use this for any multi-email automated flow. For cold outreach emails, see cold-email. For in-app onboarding, see onboarding-cro.
onboard
pbakaus/impeccable
Designs and improves onboarding flows, empty states, and first-run experiences to help users reach value quickly. Use when the user mentions onboarding, first-time users, empty states, activation, getting started, or new user flows.